Line Design and Staking Level 2
May 19–21, 2026
Chattanooga, TN
About this event
In Level 2 of the Power Line Design and Staking series, students build
on the foundation created in the prerequisite course, Level 1. This class places emphasis on horizontal and vertical clearances, joint use remedy and make ready, as well as mechanical loading calculations. After completion of Level 2, participants will be able to complete the layout and design of most overhead projects, understand and utilize NESC and sag chart criteria, evaluate and design make ready/remedy for joint use facilities, calculate the mechanical loading effects of line design, and understand conductor blowout and design for/around grain bins. Course manual provided. Final exam. Certificate of successful completion.
Pricing
$2,260.00